Skip to content

Sliding Driveway Gates in Cedar Park, TX

Cedar Park Metal Gates is the Texas capital region's trusted expert in ground track sliding driveway gates, specializing in V-track slide frames, rack-and-pinion drives, and drained track beds. We offer track slide gates and trackless cantilever gates for drives that are too short in front of the garage to swing a leaf.

Get a free gate estimate

Slide Gates for Flat Drives With Short Aprons

Our team provides track layout, leaf storage planning and operator sizing, delivering a gate that parks along the fence for homes and a heavy-duty slide for both residential and commercial projects. Backed by 17 years in business and our 18-month workmanship warranty, we've completed over 1,483 projects, from a narrow walkway slide to a wide acreage leaf.

From the concrete track strip to the last limit switch, our team handles every detail. Serving Cedar Park alongside Round Rock, Georgetown and Leander, we set each slide gate on a track that stays clear of mud, leaves and gravel.

Request a free estimate, and the crew will measure your fence line, check the grade and price the slide gate before any steel is cut.

What you can hold us to

What Stands Behind the Weld

17 yearsDrawing, welding and hanging gates from our Cedar Park shop
1,483Gates, fences, railings and entry systems completed
18-monthWorkmanship warranty on welds, hinge set, footings and gate travel
40 milesNorth to Georgetown, west to Lake Travis, south to Shady Hollow

An 18 ft Slide Gate Parked Along a Forest Creek Fence

Black sliding driveway gate half open on a track set in a concrete strip at a brick ranch house

Garrett, Forest Creek, Round Rock

Sliding Driveway Gates

Material
galvanized steel, black powder coat
Size
18 ft leaf on a flat drive
Est. investment
$2,900 to $4,400
Est. duration
2 to 3 days

A flat drive beside a fence line, too short in front of the garage to swing a leaf

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

Garrett lives in Forest Creek in Round Rock, where a flat drive runs beside a fence line and the apron is too short to swing a leaf. We set a V-track in a new concrete strip, added a rack-and-pinion drive and cut a sloped drain slot so the track stays clear. The 18 ft leaf in galvanized steel with black powder coat was an estimated $2,900 to $4,400 and took an estimated 2 to 3 days. The leaf parks along the fence and the whole drive stays usable.

When a Track Slide Gate Wins

A ground track slide gate wins when the drive is flat, the apron is short and there is straight fence line beside the opening for the leaf to park. A swing leaf needs clear arc room, and a slide leaf needs clear side room instead.

Garrett's Forest Creek lot in Round Rock had that straight fence beside the drive. A flat pad suits a track, and a sloped drive does not.

What a Ground Track Slide Gate Includes

Track
V-track set in a concrete strip, with a sloped drain slot so rain and leaf litter wash off the rail.
Operator type
Linear or articulated arm for swing leaves, rack-and-pinion for slide and cantilever, picked by leaf weight and daily cycles.
Entrapment protection
Photo eyes and edges at each pinch zone, along the whole run of the leaf.
Ground clearance
Bottom rail set to clear the highest point of the leaf arc, with drainage kept open under the gate.
Backup power
Battery backup on every operator, solar sized to shade from live oak and the number of daily cycles.
Hinge rating
Ball-bearing heavy-duty hinges rated above the finished leaf weight, with the leaf weighed before the hinge is ordered.
Finish system
Sandblast, zinc-rich primer and a polyester powder coat baked at the coater, never field paint on new steel.
Workmanship
An 18-month warranty on welds, hinge set, footings and gate travel.

Sliding Gate Cost in Cedar Park

A complete ground track slide system is estimated at $1,700 to $4,800 per system, and the leaf length, the track bed and the distance to power move that number most. A cantilever frame, which needs no track, sits higher in the table below.

Track slide gate with rack drive

Est. investment
$1,700 to $4,800 per complete system
Est. duration
2 to 3 days

A leaf on a V-track where the drive is flat and has side room for the open gate

Operator added to an existing gate

Est. investment
$1,900 to $3,700 per system
Est. duration
4 to 8 hours

Motor, photo eyes, edges and remotes fitted to a sound leaf

Trackless cantilever gate

Est. investment
$6,200 to $9,800 per complete system
Est. duration
2 to 4 days

Roller carriages and a counterbalance tail for sloped drives and heavy use

Video intercom and keypad entry

Est. investment
$750 to $4,300 per system
Est. duration
4 to 8 hours

Pedestal or column entry device tied to a phone app and resident codes

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

JobEst. investmentEst. duration on site
Track slide gate with rack driveEst. $1,700 to $4,800 per complete systemEst. 2 to 3 days
Operator added to an existing gateEst. $1,900 to $3,700 per systemEst. 4 to 8 hours
Trackless cantilever gateEst. $6,200 to $9,800 per complete systemEst. 2 to 4 days
Video intercom and keypad entryEst. $750 to $4,300 per systemEst. 4 to 8 hours

A track slide gate with rack drive typically takes 2 to 3 days, and a trackless cantilever gate typically takes 2 to 4 days. Putting an operator on a manual slide gate is estimated at $1,900 to $3,700 and takes roughly 4 to 8 hours. A walkway or courtyard entry gate beside the slide leaf is typically estimated at $650 to $1,450. These slide gate figures are estimates, and the leaf length, the track bed and the run to power can change them; the written quote fixes the final price and the schedule once the fence line is measured.

Track Slide, Swing or Cantilever

The drive and the lot decide the gate style, and a track drive is not always the winner. The table shows how we compare the three.

Gate styleNeedsWeak point
Ground track slideFlat drive and straight fence for storageTrack can foul with mud or gravel
Swing leafClear arc room and a level driveArc blocked by a short apron or steep grade
Trackless cantileverStorage room plus a counterbalance tailHigher cost and a longer frame

Track Maintenance, Drainage and Leaf Storage

A slide track stays reliable only when water can leave it, so the drainage is built into the concrete strip. We slope the strip, cut a drain slot under the V-track and keep the rail clear of the soil line.

Debris is the common cause of a stalled slide gate. Gravel, oak leaves and mud settle in the track, so we tell owners to sweep it and check the rollers at each service visit. Leaf storage must stay clear, because a stored leaf blocked by a planter or a parked car cannot close. Yvonne in Volente chose a trackless frame because her lake lot drive falls toward the road and washes gravel across any track. Cole in Leander chose swing leaves because his drive had level room behind the line. Lorna's 26 ft opening on Chisholm Trail Road took a heavy cantilever for box trucks, with no track in their lane.

Safety and Fire Access for Slide Gates

A slide gate is tested for entrapment before we leave, by tripping each photo eye and edge until the leaf reverses. Round Rock's Fire Marshal guidelines call for a city-approved Knox key switch on access-controlled gates and an acceptance test, and Lakeway asks for a key switch for Travis County ESD #6, so confirm current text with the city. On a Cedar Park drive, the fire department that covers your address is asked and what it says goes on your quote.

Gate Materials and Related Options

Tube steel is the standard leaf material for a slide gate, and our steel gate material comparison explains galvanizing and powder coat. If your drive slopes or the soil is soft, a trackless cantilever gate removes the track completely.

New matte black steel gate leaf hung on existing painted brick columns over a concrete drive

Why Owners Choose Our Crew for Slide Gates

We set the track, the drive and the leaf ourselves, so the crew that pours the strip is the crew that wires the operator. In 17 years and over 1,483 projects, the 18-month workmanship warranty has covered welds, rollers, footings and gate travel on every slide gate.

Sliding Gate Service Areas

We install slide gates across a 40-mile radius, with jobs in Round Rock, Georgetown and Leander, and the other towns we cover are listed on the service area page. Round Rock and Georgetown lots with a short apron typically take 2 to 3 days for a slide leaf, while Leander and Cedar Park single swing alternatives typically take 1 to 2 days. Lakeway and Steiner Ranch hillsides often push owners toward trackless frames, which typically need 2 to 4 days. Footings on Volente and West Lake Hills lots hit limestone, so rock bits ride along on those jobs. A city or fire review comes first in Rollingwood and Shady Hollow, before the slide leaf is ordered. The Hills adds association approval first. Garrett's 18 ft leaf in Forest Creek rides a V-track set in a new concrete strip, with a sloped drain slot to keep the track clear. A rising drive like Beckett's in Great Hills does not suit a track, so his 14 ft leaf swings and was cut to clear the grade. Maribel's 16 ft opening in Rough Hollow sits between limestone columns, and a swing pair fit there at an estimated $6,400 to $7,900. Jerome's Andice Road acreage in Georgetown took a 16 ft swing leaf, an estimated $3,400 to $4,700. Gina's Airport Road yard in Georgetown shows the perimeter side, with 320 lf of anti-climb panels installed in sections. Desmond's Travisso entry in Leander was built one lane at a time on a posted schedule, the way we phase any busy slide gate job.

Two deep grey tube steel gate leaves with a horizontal mid rail over a wide concrete drive

Related Gate Services

A slide gate often pairs with gate access control and intercoms for visitors, a solar gate operator where power is far away, or retrofit operators for a gate you already own.

Sliding Gate Questions Answered

How much does a sliding gate cost in Cedar Park?

A track slide system is typically estimated at $1,700 to $4,800, and your written quote fixes the price once the fence line is measured.

How many days is a crew on site for a slide gate?

A track slide gate is an estimated 2 to 3 days of work, pouring the strip included, and the written quote names the days.

Will a sliding gate work on a sloped drive?

A track gate wants a flat drive, so on a slope we usually recommend a trackless cantilever frame instead.

Does the track get clogged with mud and leaves?

It can, which is why we slope the concrete strip and cut a drain slot so water carries debris off the rail.

How much fence line does the leaf need?

Plan on straight, clear fence line equal to the leaf length plus the tail, and we measure it on the site visit.

Can I add an operator to a manual slide gate?

Yes, a manual slide leaf can take an operator for an estimated $1,900 to $3,700.

Request Your Sliding Gate Estimate

Request a free estimate, and the crew will walk the fence line, check the grade and write a quote that names every part of the slide system.

Recent Work From Our Cedar Park Shop

Start to finish

How a Gate Gets From Our Shop to Your Drive

  1. Site measure

    An estimator walks the opening, reads the grade and marks where the leaf or the slide run has to clear.

  2. Drawings and approval

    Steel gets cut only after you sign off on a scaled drawing that names the tube, the coating and the opener.

  3. Shop fabrication

    Our Cedar Park welders build it, the steel goes for galvanizing and powder coat, and it ships finished.

  4. Install and safety test

    Posts cure, the leaf goes up, the opener gets wired, and you watch each photo eye and edge stop the gate.

Free estimate

Ready to Talk About Sliding Driveway Gates?

Call us or send the form, and we will book a site measure and a written estimate.

Call (512) 631-0107

Calls only, we do not receive text messages.

Call (512) 631-0107